In Italy, after a first phase in which BIM issues were generally debated in restricted enclaves, mainly in scientific fields that have explored the methodological aspects or industrial contexts interested in the produc-tive-commercial ones, we are confronted with a renewed need and awareness, the first triggered by the D.M. 560/17, the second is also the result of the recent publication of part 7 of UNI 11337 which, by de-fining the roles and competences of operators in the BIM field, repre-sents a fundamental guiding element in the definition of the processes of digitalization of the design and management of civil engineering, ar-chitecture and historical-monumental works.
In Italia, a valle di una prima fase nella quale le tematiche sul BIM sono state dibattute generalmente in enclave ristretti, principalmente ambiti scientifici che ne hanno esplorato gli aspetti metodologici o contesti industriali interessati a quelli produttivo-commerciali, ci troviamo di fronte ad una rinnovata esigenza e consapevolezza, la prima innescata dal D.M. 560/17, la seconda scaturita anche dalla recente pubblicazio-ne della parte 7 della UNI 11337 che, definendo ruoli e competenze degli operatori in ambito BIM rappresenta un fondamentale elemento di indirizzo nella definizione dei processi di digitalizzazione della proget-tazione e gestione delle opere ingegneria civile, architettura e storico-monumentali.
Evoluzione digitale tra aspettative e maturità di mercato
CENNAMO G
2019-01-01
Abstract
In Italy, after a first phase in which BIM issues were generally debated in restricted enclaves, mainly in scientific fields that have explored the methodological aspects or industrial contexts interested in the produc-tive-commercial ones, we are confronted with a renewed need and awareness, the first triggered by the D.M. 560/17, the second is also the result of the recent publication of part 7 of UNI 11337 which, by de-fining the roles and competences of operators in the BIM field, repre-sents a fundamental guiding element in the definition of the processes of digitalization of the design and management of civil engineering, ar-chitecture and historical-monumental works.File | Dimensione | Formato | |
---|---|---|---|
Cennamo_GerardoMaria_fullpaper_rev.docx.pdf
non disponibili
Dimensione
338.67 kB
Formato
Adobe PDF
|
338.67 kB | Adobe PDF | Visualizza/Apri Richiedi una copia |
I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.